1.

Corridor is used by many Amtrak trains, including the high-speed Acela, intercity trains and several long-distance trains.

FactSnippet No. 1,253,372
2.

The ACSES will enable Amtrak Northeast Corridor to implement positive train control to comply with the Rail Safety Improvement Act of 2008.

FactSnippet No. 1,253,373
3.

In 1971, Amtrak Northeast Corridor began operations, and various state governments took control of portions of the NEC for their commuter transportation authorities.

FactSnippet No. 1,253,374
4.

In 1973, the Regional Rail Reorganization Act opened the way for Amtrak Northeast Corridor to buy sections of the NEC not already been sold to these commuter transportation authorities.

FactSnippet No. 1,253,375
5.

Amtrak Northeast Corridor still operates and maintains the portion in Massachusetts, but the line from New Haven to New Rochelle, New York, is operated by the Metro-North Railroad, which has hindered the establishment of high-speed service.

FactSnippet No. 1,253,376
6.

In 1996, Amtrak Northeast Corridor began installing electrification gear along the 157 miles of track between New Haven and Boston.

FactSnippet No. 1,253,377
7.

Amtrak Northeast Corridor owns the track between Washington and New Rochelle, New York, a northern suburb of New York City.

FactSnippet No. 1,253,378
8.

Amtrak Northeast Corridor owns the tracks north of New Haven to the border between Rhode Island and Massachusetts.

FactSnippet No. 1,253,379
9.

At just over 453 miles, the Northeast Corridor is the longest electrified rail corridor in the United States.

FactSnippet No. 1,253,380
10.

Amtrak Northeast Corridor owns Pennsylvania Station in New York, 30th Street Station in Philadelphia, Pennsylvania Station in Baltimore, and Union Station in Washington.

FactSnippet No. 1,253,381
11.

Main services of the Northeast Corridor are indicated using the following abbreviations.

FactSnippet No. 1,253,382
12.

Entire Northeast Corridor has 11 grade crossings, all in southeastern New London County, Connecticut.

FactSnippet No. 1,253,383
13.

Eight other Amtrak Northeast Corridor trains terminate at NEC stations, but do not use any NEC infrastructure outside the terminus:.

FactSnippet No. 1,253,384
14.

Six Amtrak services operate via the Empire Corridor, a line largely owned by CSX, with other sections owned by Metro-North Railroad and Amtrak.

FactSnippet No. 1,253,385
15.

In October 2010, Amtrak released "A Vision for High-Speed Rail on the Northeast Corridor, " an aspirational proposal for dedicated high-speed rail tracks between Washington, D C, and Boston.

FactSnippet No. 1,253,386
16.

In 2012, the Federal Railroad Administration began developing a master plan for bringing high-speed rail to the Northeast Corridor titled NEC FUTURE, and released the final environmental impact statement in December 2016.

FactSnippet No. 1,253,387
17.

In February 2011, Amtrak Northeast Corridor announced plans for the Gateway Project between Newark Penn Station and New York Penn Station.

FactSnippet No. 1,253,388
18.

Amtrak Northeast Corridor will pay off the loans from increased NEC passenger revenue.

FactSnippet No. 1,253,389
19.

Amtrak Northeast Corridor Maglev, using SCMaglev technology developed by Central Japan Railway Company, is currently working with the FRA and MDOT to prepare an Environmental Impact Statement.

FactSnippet No. 1,253,390
20.

The work will lay tracks to the New York Connecting Railroad right of way, allowing Amtrak Northeast Corridor trains arriving from or bound for New England to avoid NJT and LIRR trains.

FactSnippet No. 1,253,391
21.

Amtrak Northeast Corridor has applied for $15 million for the environmental impact studies and preliminary engineering design to examine replacement options for the more than 100-year-old, low-level movable rail Pelham Bay Bridge over the Hutchinson River in the Bronx that has been limiting speed and train capacity.

FactSnippet No. 1,253,392